Vivek,
Budget control can be activated in an FM Area from a particular year. So you can activate budget control from 2013 in the step Budget Control System (BCS) > Availability Control > Define Activation of Availability Control. You will need to make sure that the budget for 2013 has been populated in the system.
Thanks
Shyam