Hello,
Avalability control is activated and I ma working with BCS Budget.
In 2013 I have introduce my budget FMBB (Budget line). Then I have created a reserve agaisnt this budget line.
When I try to do the carry forward the budget line is not carry forward and so the reserve in 2014 is trying to consume a budget line that do not exist.
Please find a document with the images of the customizng and the 4th one with the result of the budget in 2014 but without the availability control (I get a negative ammount).
Regards,
Daniel